Thre-level Regulator 67.3702-01
1 Installation
1.1 Take out the regular brush unit with regulator.
1.2 Install brush unit into generator and fasten it firmly.
1.3 Install regulator it the convenient place with its base opening on the vacant mass pin (remove dust and rust from the pin first).
1.4 Turn the switch to one of the three positions depending on the need of exploitation.
2 Voltage Positioning
2.1 «min» (13,6V) position – either for operation at high outside temperature (>20ºС) or for unusual operation (traffic jam, upward movement, etc.);
2.2 «mid» (14,2V) position – for operation at outside temperature between 0ºС and 20ºС;
2.3 «max» (14,7V) position- for operation at minus outside temperature and for battery charging.